Tuesday, September 20, 2011

Springfield

It's been a couple of weeks since I was last down south, but I still have a few photos from the trip that haven't been posted. These particular ones were a great reminder of one of my most interesting railfanning experiences, and the chance to take a (short) cab ride.

Last time through Springfield, sure enough, Harvestland was loading a train. And just like every other time I've seen this, my friend George was running the Harvestland engine.

>
This is a huge facility. It's likely been mentioned before that they have storage capacity for around 10 complete shuttle trains, and can load such a train in less than 12 hours when everything goes right. Here's a shot of the shuttle power, which brings the train off the BNSF at Florence and across the former DME to Springfield. You can get an idea of the size of the elevator in the background.

Interestingly, although they load these unit trains, there is no loop, just a long siding. The complex also includes a fertilizer plant and Harvestland unloads both dry and liquid fertilizer at this location along with loading grain trains. It's a good rail customer.


In addition to the nicely painted GP, they also have a trackmobile, I assume for the fertilizer cars. A trackmobile wouldn't do much good when trying to get a shuttle loaded.

For that you need a hard-working locomotive, something as seen in the following picture. You can bet that George is at the throttle, waiting for her to load up and then the radio call from the control booth "That's good, George".


This is one of the countless activities on the railroad that will never get old for me. It's hard to picture passing this location and not stopping when something rail related is going on, and I hope I never have to.

No comments:

Post a Comment